NRW · DACH · Europe
Time studies & standard times: calculate and steer with confidence
Time studies provide a solid basis for standard times, costing, capacity planning and productivity control. The goal is a data foundation that works in day-to-day operations – transparent, fair and practical.
What You Get
- Time studies including process structuring (elements / sub-operations)
- Performance rating and allowances (documented in a practical way)
- Standard times per variant / item as a basis for planning, costing and target-actual comparisons
- Optional: standard work / workstation design to stabilize the process
Typical Use Cases
- Discussions about times / lack of transparency
- Quotation and costing reliability (piece costs, capacities)
- New products / variants – reliable standard time per part
- Productivity programs: evaluate actions with evidence
Approach
- Assessment: processes, variants, disturbance factors, data basis
- Measurement: systematic time studies, documentation and plausibility checks
- Derivation: standard times, standards and KPI / comparison logic
- Anchoring: training, rules and review routines so the system holds up in day-to-day use
FAQ
How quickly can a reliable standard time be available?
Depending on the number of variants and the scope, often within a few days to weeks – with an aligned measurement strategy.
Is it “fair” for employees?
Yes, if the method and boundary conditions are documented properly – that is exactly what we focus on.
Reply typically within 1 business day.